英语翻译酒店工程部定员编制42 人,现实际在岗员工32 人,其中弱电及运行班组11 人(缺4人),另综合维修班组含木工、油漆、泥工、机修、电工等22人(缺6人)实行四班三运转.由于市场上较

来源:学生作业帮助网 编辑:作业帮 时间:2024/04/27 17:35:57

英语翻译
酒店工程部定员编制42 人,现实际在岗员工32 人,其中弱电及运行班组11 人(缺4人),另综合维修班组含木工、油漆、泥工、机修、电工等22人(缺6人)实行四班三运转.由于市场上较难招聘到岗位合适员工,又因酒店规模范围广、区域功能配套多、实际工作量大等原因,较多设施设备的预防性维护保养、维修及部分改造工作无法完全跟进按时完成.为保证酒店设施设备处于良好的运行状态和正常运营,减少部分设施设备因不及时维护或维修导致的故障损坏而降低使用寿命增加维修成本.经内部征询员工意见,拟通过部分人员自愿每人每月增加四天加班的方式跟进完成相关工作,预计每月产生40-50人次的加班费用,部门内部将严格控制并按照加班工时与工作量相结合来督导考量审核.特请酒店管理层给予批准实施!

The hotel engineering capacity preparing 42 people, now the actual job employees 32 people, including weak and run team 11 (missing four), another comprehensive maintenance team including carpentry, painting, masonry, machine repair, electrical and other 22 people (missing 6) implement four classes of three running. Since the job market is more difficult to recruit suitable staff, because a wide range of hotel-scale, multi-regional support functions, the actual workload and other reasons, many preventive maintenance, repair and renovation work part of the facilities and equipment not fully follow up on time completed. Hotel facilities and equipment in order to ensure good operating condition and normal operations, reduce some facilities and equipment due to failure without timely maintenance or repair damage caused by increased service life and reduced maintenance costs. After an internal consulting his staff, to be part of the staff through voluntary overtime four days each way to increase the monthly follow-up to complete the relevant work is expected to produce 40-50 times the monthly overtime costs, internal departments and overtime will be strictly controlled in accordance with the consider combining the amount of audit supervision. Please give special hotel management for approval!

Hotel engineering department for the preparation of 42 people, the actual on-the-job employees 32 people, including weak and operation team 11 (missing 4 people), the other comprehensive repair team w...

全部展开

Hotel engineering department for the preparation of 42 people, the actual on-the-job employees 32 people, including weak and operation team 11 (missing 4 people), the other comprehensive repair team with wood, paint, Mason, mechanical, electrical and other 22 (missing 6 people) the implementation of four class of three. Because the market is more difficult to recruit suitable staff positions, and because of the size of the hotel, a wide range of regional supporting functions, the actual workload and other reasons, many facilities equipment preventive maintenance, repair and renovation work can not completely follow up finish. To ensure the hotel facilities and equipment in good running condition and normal operation, reduce some facilities for fault damaged not timely maintenance or repair leads to reduce the service life increased repair costs. Through the internal consulting staff opinions, the personnel per person per month for four days increased voluntary overtime work up to finish related work, is expected to produce 40-50 million monthly overtime costs, internal departments will be strictly controlled and in accordance with the overtime hours and workload are combined to consider audit supervision. Please give the approval and implementation of hotel management!

收起

Hotel engineering capacity 42 people, now the actual
on-the-job staff of 32 people, including low voltage and operation team 11 (4),
the other comprehensive maintenance team including wood, ...

全部展开

Hotel engineering capacity 42 people, now the actual
on-the-job staff of 32 people, including low voltage and operation team 11 (4),
the other comprehensive maintenance team including wood, paint, bricklayer,
mechanics, electricians and other 22 people (short of 6) implementation class
four three operation. Because the market difficult to recruit suitable staff,
and because the hotel scale range, regional supporting functions, such as the
actual workload big reason more, more the preventive maintenance of equipment,
maintenance and some renovation work cannot follow up done on time. In order to
ensure the good operation of the hotel facilities and normal operation, reduce
the part of the facilities of failure caused by not timely maintenance or repair
damage and reduce the service life increase maintenance costs. By internal ask
their employees to increase four days through voluntary part personnel per month
follow up related work overtime, is expected to produce 40-50 a month overtime
fee, departments will be strictly controlled and according to the combination of
overtime working hours and workload to supervise the account audit. Hotel
management, please give approval to implement!

收起

The hotel engineering capacity preparing 42 people , now the actual job
employees 32 people, including weak and run team 11 ( missing four ) , another
comprehensive maintenance team includin...

全部展开

The hotel engineering capacity preparing 42 people , now the actual job
employees 32 people, including weak and run team 11 ( missing four ) , another
comprehensive maintenance team including carpentry , painting, masonry, machine
repair , electrical and other 22 people ( missing 6) implement four classes of
three running. Since the job market is more difficult to recruit suitable staff
, because a wide range of hotel -scale , multi- regional support functions , the
actual workload and other reasons, many preventive maintenance , repair and
renovation work part of the facilities and equipment not fully follow up on time
completed. Hotel facilities and equipment in order to ensure good operating
condition and normal operations , reduce some facilities and equipment due to
failure without timely maintenance or repair damage caused by increased service
life and reduced maintenance costs. After an internal consulting his staff , to
be part of the staff through voluntary overtime four days each way to increase
the monthly follow-up to complete the relevant work is expected to produce 40-50
times the monthly overtime costs , internal departments and overtime will be
strictly controlled in accordance with the consider combining the amount of
audit supervision . Please give special hotel management for approval !

收起